The tank is 6” tall, so to secure it I built a box. I ripped a piece of 1x8 pvc trimboard down to 6” wide to build it with.
Then I drilled holes around the lip of the tank to secure it to the box with stainless screws.
I did this before opening the trailer. Once I removed the old toilet i realized I was going to have to modify. The discharge on the tank was located 3/4” closer to the frame rail in the trailer and 2” toward the tub from the hole in the floor. The 2” would be easy to trim off the existing hole but the 3/4” would put it on the trailer frame. Luckily the mounting flange on the tank is 1-1/4”, so I was able to trim off 3/4” from the back side.
Now I had to modify the box I built for the shortened back flange AND for the wheelwell interference I didn’t anticipate.